A Better Way – Project Case Study
Project Cable
116,000
SF
Background
Project Cable was a major industrial expansion for Prysmian Group in Du Quoin, focused on enhancing manufacturing capacity and supporting long-term operational growth at the facility. The project included the construction and integration of specialized production and support spaces tailored to cable manufacturing operations. Work was carefully coordinated within an active industrial environment, requiring detailed planning, sequencing, and safety oversight to minimize disruptions to ongoing plant operations. Key elements of the project included structural and building system upgrades, coordination with specialized equipment installations, and infrastructure improvements necessary to support high-demand manufacturing processes. Close collaboration with Prysmian Group’s operations team ensured the facility enhancements aligned with production needs, performance requirements, and future expansion flexibility.
Project Cable reinforces Prysmian Group’s commitment to investing in domestic manufacturing while strengthening the Du Quoin facility’s role in supporting critical energy and infrastructure markets.

If you’re looking to bring a project to reality, we’d love to hear more about you and your company,